Wudu basin-a tui mid-ablution-a pool-na chuan faina chungchangah harsatna a siam a, throughput bottleneck a siam bawk. A bulpui ber chu pipe clogged - a ni ngai lo tluk a ni a, chu chu drain design, basin geometry, emaw maintenance schedule emaw a ni. A siamthat nan chuan tui kalna tur engineering a ngai a, bawlhhlawh pipe chu tuiah paih a ngai lo.
1. Drain Grate thlan dan tur
| Drain chi hrang hrang | Hawnna hmun a ni | Flow Rate a ni | Debris Trap a ni | Best For |
|---|---|---|---|---|
| 32 mm a rawn pop-a chhuak | 804 mm2 a ni | 15 L/min a ni | Sang | Kut silfai |
| 32 mm grid a ni | 804 mm2 a ni | 18 L/min a ni | Hmanrua | Eng wudu |
| Slot zau tak a awm | 4,500 mm2 a ni | 40 L/min a ni | Hniam | Mosque wudu a ni |
| Dual slot a awm bawk | 7,500 mm2 a ni | 55 L/min a ni | Hniam | Traffic mosque sang tak-a awm |
2. Basin thuk zawng leh Floor Slope
140 mm a ni
Drain point-ah a thuk ber. 120 mm hnuai lam: surface tension blocks grate + splash escapes rim.
2℃a sang a ni
Drain lam hawia floor angle tlem ber (35 mm/m). Verify: Hmun hla ber a 5 L leih chuan second 15 hnuai lamah a clear thei.
3. Trap enkawl dan tur ruahmanna
| Nitin User te | Trap enfiah rawh | Deep Clean a ni | P-Trap thlak leh rawh |
|---|---|---|---|
| <30 | Thla tin | Quarter tin a ni thin | Kum 3 chhung a ni |
| 30–50 | Bi-kar tin | Thla tin | Kum 2 chhung a ni |
| 50–100 | Kar tin | Bi-kar tin | Kumtin |
| 100+ | 2× kar tin a ni | Kar tin | Thla 6 chhung a ni |
📌 Yingjie Sanitary Ware-a chuan wudu tuikhuah a siam a- 140 mm thuk, 2℃cast-in slope, wide slot drain ready. Hmu:ceramic vs solid surface wudu basin nena khaikhin a ni.
FAQ
Engvangin nge ka wudu basin chu a tui chhuak zawi zawi?
Wudu basins-a tui luang chhuak slow hi engineering emaw maintenance emaw vawi thum a chhiat vang a ni tlangpui. Pakhatnaah chuan standard 32 mm pop-up waste hman a ni fo a, chu chuan dual foot washing-a 20-30 L/min flow siam chu a huam thei lo. Pahnihnaah chuan basin floor slope chu℃2 aia tlem a nih chuan tui chu a clear tha lo ai chuan flat zone-ah a pool ang. A tawpah chuan P-trap hi ke silna atana danglam bik sock fiber leh grit ang chi thil chi hrang hrangin a khuh fo thin.
Wudu basin atan drain type tha ber?
Traffic sang-mosque installation atan chuan slot drain zau tak, 25–30 mm hawnna leh 150–200 mm sei tur kan rawt a ni. He design hian opening area 4,500 mm2 vel a pe a, hei hi standard circular drain aiin a let 3–5 in a lian zawk a ni. Hetianga surface area tihpun hian system hian flow rate 35–45 L/min a handle thei a, hei hian tui backup a veng tha hle. Tin, linear slot hi self-cleaning a ni a, sam leh debris te trap thin internal mechanisms a tlachham bawk.
Wudu basin hi engtiang chiahin nge a thuk tur?
Professional wudu basin chuan ding chunglam nena khaikhin chuan drain point-ah a thuk ber chu 140 mm a vawng reng tur a ni. Hetiang thuk hi a pawimawh hle a, a chhan chu drain grate-a surface tension hneh theihna turin water head pressure mamawh a siam a ni. 120 mm hnuai lam thuk taka siam basins te chu a chhe fo thin a, chu chuan tui ding reng leh side walls chungah splash escape nasa tak a thlen thin. A tha ber tur chuan he thuk tak hi ceramic chhunga 2-degree floor slope cast nen inzawm tir rawh.
Wudu trap tihfai tam dan?
Wudu basin trap enkawl dan tur hi nitin chibai buktute volume-ah a innghat nghal a ni. Basin khata hmangtu 100 chuang awmna mosque tamna- tan chuan sediment a pun loh nan kar khatah vawi hnih-inspection leh kar tin deep cleans kan mamawh a ni. Facility hmangtu 30 aia tlem lo rawngbawlna chu thla tin inspection cycle-ah a inthlak thei a ni. Wudu basins-ah hian standard sink aiin fibrous debris a let thum zetin a tam zawk avangin facility manager-te chuan sign-off sheet awmna log book khauh tak an vawng reng tur a ni.
Standard sink hian wudu tan hna a thawk thei ang em?
Standard bathroom sink hi Islamic ablution-a ergonomics leh water volume bikte enkawl thei tura engineer a ni lo. A tlangpuiin 140 mm basin depth leh 2-degree floor slope mamawh chu slow drainage leh pooling venna atan an nei lo. Chubakah, 400–500 mm foot bay a awm loh avangin a chhehvela facility floor-ah lateral splash damage nasa lutuk a awm bawk. Standard sink retrofit tum hian kar hmasa chhungin faina a tichhe fo a, tui a tichhia a, a man to hle bawk.
Wudu Basin Drainage Specs leh Project Quote te chu dawng rawh
Mosque project hrang hrang atan wudu area drainage siam that? wide-slot drain product datasheet leh installation slope guide te hriat duh chuan Yingjie Sanitary Ware zawhfiah theih a ni.
Drainage Specs & Commercial Quote dil theih a ni
